Projects

DJ Ponte DJ Ponte

Belli Ranch Trails Project

This trail project, in partnership with the US Forest Service and Sierra Trail Works, will establish multiple miles of connection between future and ongoing housing developments in Verdi, to the Tom Cooke Trail, and to serve as a section of the Sierra Front connection that will connect the Mt. Rose trail network area to Truckee via singletrack and dirt roads.

Read More
DJ Ponte DJ Ponte

Sierra Vista Bike Park

Since 2019 when the City of Reno partnered with the Biggest Little Trail Stewardship to utilize the area utilized as a municipal golf course, we have installed approximately 5 miles of purpose-built mountain bike specific trails including an area dubbed “High Fives”, funded by and named after High Fives Foundation, for the trails built specifically for adaptive mountain bikes for riders who may not be able to utilize a normal two-wheeled bicycle.

Read More
DJ Ponte DJ Ponte

NE Peavine Trails Project

The scope of this project is to conduct trail planning activities including required NEPA studies using private contractors with the objective to obtain categorical exclusion approval from the US Forest Service for 12.7 miles of new sustainable non-motorized multi-use single track recreational trails on the northeast side of Peavine Mountain. 

Read More
DJ Ponte DJ Ponte

Tamarack Lake Trail Extension Planning

Obtain approval of a 6 to 7.5 mile extension of Tamarack Lake Trail connecting Reno/Truckee Meadows Trails with the Tahoe Basin Trails by a quality sustainable multi-use non-motorized singletrack track trail open to mountain bike use.

Read More

Sign up for our Newsletter

Sign up to be the first to know about our events.

Follow along at @renotrails